Service

Surveying

Surveying

The horizontal distance plotted on a map is to be 200m but measured in sloppy field i.e. in slopping ground slopped in 1:20. What is the field measured length before correction deployed?

praveen mahajan 19-Jul-2017

Answer (Solved)

question Get solution