Home / Questions / Problem S7 15 Question Help A production process at Kenneth Day Manufacturing is shown in ...

Problem S7 15 Question Help A production process at Kenneth Day Manufacturing is shown in the figure below The drilling oper d What is the monthly compacity

Problem S7.15 Question Help A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling oper

d. What is the monthly compacity?

Problem S7.15 Question Help A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 2.1 unils/hr Sawing 5 units/hr Sanding Assembly 0.8 unitshr Welding 2.5 units/hr Assembly 0.8 unitsilhr Drilling 5 units/hr Assembly 0.8 units/hr a) Sawing is the bottleneck. b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places).

Jun 14 2020 View more View Less