Pipe 2 has been inserted into Pipe 1 however the holes for a connecting pin are initiallyoffset by a gap s as depicted below Suppose a temperature change Delta T is to be applied to the entire

Pipe 2 has been inserted into Pipe 1; however, the holes for a connecting pin are initially offset by a gap s as depicted below. Suppose a temperature change Delta T is to be applied to the entire structure to align the hole for the connecting pin. Find the temperature change Delta T_c required to close the gap A pin is inserted after the gap has closed. Find the reaction forces R_A and R_B if the entire structure has returned to original ambient temperature Find the maximum shear stress in the pin assuming the pin has diameter The answer in part b should be in terms of s, E, A, L only

 

Jun 26 2020 View more View Less

Answer (Solved)

question Subscribe To Get Solution

Related Questions