Home / Questions / Direct control is the control that is exercised after the deviations from plans have
Direct control is the control that is exercised after the deviations from plans have occurred. Which of the following is not the underlying assumption of direct control?
(a) Performance can be measured
(b) Personal responsibility is absent
(c) The time expenditure is warranted
(d) Mistakes can be discovered in time
(e) The individual who is responsible will take corrective steps.
Apr 03 2018 View more View Less
Connective tissue sacs lined with synovial membranes that act as cushions in places where friction develops are called ________.
Apr 16 2020Your system is rejecting the question am asking which is preceded by a case study It says the question is too long but if I leave out the case study which contains import...
Feb 14 2020Consider the following tableQuatitity Total cost0 $83 96 109 1112 1315 1918 2721 37(1) Calculate marginal cost for each entry of the quantity in the above table(2) Suppo...
Mar 17 2020What is the depreciation deduction, using the declining balance (DB) method with a 200% DB ratio, associated with the third y
Jun 05 2020A bond has a coupon of 6%. It has a face value of $100. It pays interest semiannually. The bond was issued on March 18th, 2013. The settlement date is March 21st, 2013. T...
Nov 08 2017The producer in problem one, w fertilizer and irrigation water. Costs are $500/ton of fertilizer ... Please help I’m so confused on this problem The producer in problem o...
Apr 30 2020de deficit occurs when A) a country's firms open more stores abroad than foreign firms open in the country. B) foreign firms open more stores in a country than the co...
Feb 07 2020Evaluate the following indefinite integral. 2 da = Note: Don't forget your C! And be sure to use an uppercase C!
Apr 19 2021The market power effect of an international joint venture can lead to welfare losses for the domestic economy unless offset by cost reductions. Which type of cost reducti...
Nov 23 2019