CASE 10–17 Working Backwards from Variance Data [LO1, LO2, LO3]
You have recently accepted a position with Lorthen Inc. As part of your duties, you review the vari- ances that are reported for each period and make a presentation to the company’s executive committee.
Earlier this morning you received the variances for one of the company’s major products for the most recent period. After reviewing the variances and organizing the data for your presenta- tion, you accidentally placed the material on top of some papers that were going to the shredder. In the middle of lunch you suddenly realized your mistake and dashed to the shredding room. There you found the operator busily feeding your pages through the machine. You managed to pull only part of one page from the feeding chute, which contains the following information:
Standard Cost Card
Direct materials, 2.0 meters at $16.00 per meter . . . . . . . . $32.00 Direct labor, 1.0 hours at $15.00 per hour . . . . . . . . . . . . . . $15.00 Variable overhead, 1.0 hours at $9.00 per hour . . . . . . . . . $9.00
|
Total Standard Cost |
Quantity or Efficiency Variance |
Price or Rate Variance |
Direct materials . . . . . . . . . |
$608,000 |
$32,000 U |
$11,600 F |
Direct labor . . . . . . . . . . . . . |
$285,000 |
$15,000 U |
$4,000 U |
Variable overhead . . . . . . . |
$171,000 |
Ruined by shredder |
$4,000 F |
The standard for variable overhead is based on direct labor-hours. All of the materials purchased during the period were used in production.
At lunch your supervisor said how pleased she was with your work and that she was looking forward to your presentation that afternoon. You realize that to avoid looking like a bungling fool you must somehow generate the necessary “backup” data for the variances before the executive committee meeting starts in one hour.
Required:
1. How many units were produced during the period?
2. How many meters of direct materials were purchased and used in production?
3. What was the actual cost per meter of material?
4. How many actual direct labor-hours were worked during the period?
5. What was the actual rate per direct labor-hour?
6. How much actual variable manufacturing overhead cost was incurred during the period?
Jun 28 2020 View more View Less
Performance Management and Performance Appraisal-Human Resources Management AssignmentQuestion:What is HR’s role in performance management and performance appraisaland ho...
May 08 2020Soru 8 Given a system of floating exchange rates, rising income in the United States would trigger a (an): Yanıtınız: O increase in the demand for imports and an increase...
Apr 08 2021Two legal issues related to mishandling of information by the data analyst of F4F .b) Two ethical issues in InfoSec to be followed by the delivery staff of F4F .c) Two me...
Mar 13 2020The December 31, 2015, balance sheet of Schism, Inc., showed long-term debt of $1,445,000, and the December 31, 2016, balance sheet showed long-term debt of $1,670,000. T...
May 19 2018Organisms whose life history adaptation is called semelparity (A) Produce young only late in life (B) Produce a large batch of young and die (C) Produce young over ...
Mar 19 2018identify the process that maximum profit per day if each part is made from RM4 worth of material and can be sold for RM30 both processces are fully automated and vari...
Mar 31 2020As WLANs become more powerful, what are the implications for networks of the future? Will wired LANS still be common or will we eliminate wired offices?
May 07 2020A compound strut consists of a steel tube of length 1 m, outer diameter 35 mm and inner diameter 25 mm which is brazed a copper tube of length 1.5 m, outer diameter 35 mm...
Jun 30 2020Why did the company fail and what are the causes that led to the failure of this company in the 21st century? Discuss about the management and the Ceo’s and how they man...
Mar 17 2020