Calculate NPV (net present value) for the following project, assuming the required rate of return = 10%) Period cash flow 0. -150.000 1. 80.000 2. 120.000

Calculate NPV (net present value) for the following project, assuming the required rate of return = 10%)
Period cash flow
0. -150.000
1. 80.000
2. 120.000