Blue Box Beach Chairs has the following standards to make beach chairs: Standard Quantity Standard Price Direct materials
22 pounds of polywood per chair $350 per pound Direct labor 065 hours per chair $1300 per hour
The static budget was based on the production of 6,200 beach chairs The company used 13,000 pounds of polywood in order to make 6,000 chairs in April The company purchased 7,000 pounds of polywood at a total cost of $24,150 How much is the direct materials quantity variance?
A) $700 favorable
B) $2,240 favorable
C) $350 favorable
D) $1,050 favorable
2
Blue Box Beach Chairs has the following standards to make beach chairs: Standard Quantity Standard Price Direct materials 22 pounds of polywood per chair $350 per pound Direct labor 065 hours per chair $1300 per hour
The static budget was based on the production of 6,200 beach chairs The company used 13,000 pounds of polywood in order to make 6,000 chairs in April The company purchased 7,000 pounds of polywood at a total cost of $24,150 How much is the direct materials price variance?
A) $700 favorable
B) $2,240 favorable
C) $350 favorable
D) $1,050 favorable
3 3 If the material quantity variance is favorable, the
A) material price variance will be unfavorable
B) material price variance must also be favorable
C) quantity purchased is less than the quantity used
D) actual quantity used is less than the standard quantity allowed
Electric Zero produces relay units for generators Each relay has a standard cost of $67 Standards call for two relays per generator In July, the company purchased 120 relays for $7,560 The company used 104 relays in the production of 50 generators, with four relays damaged in the installation process The standard quantity of labor is 20 hours per generator, with a standard wage rate of $23 In July, the company incurred 1,020 labor hours at a cost of $22,950 How much is the labor rate variance?
A) $460 unfavorable
B) $50 favorable
C) $510 favorable
D) $460 favorable
5 Electric Zero produces relay units for generators Each relay has a standard cost of $67 Standards call for two relays per generator In July, the company purchased 120 relays for $7,560 The company used 104 relays in the production of 50 generators, with four relays damaged in the installation process The standard quantity of labor is 20 hours per generator, with a standard wage rate of $23 In July, the company incurred 1,020 labor hours at a cost of $22,950 How much is the labor efficiency variance?
A) $460 unfavorable
B) $50 favorable
C) $510 favorable
D) $460 favorable
6Which of the following may cause an unfavorable material variance?
I More material was used than planned
II II A company paid a higher price for materials than expected
III III More materials were used than purchased
A) I and II
B) II and III
C) I and III
D) I, II, and III
Mar 23 2020 Read more Less More
Jerry’s burger and magazine budget is $12 a week. The price of a burger is $2, and the price of a magazine is $4.1. List the combinations of burgers and magazines that Je...
Jun 03 2020Problem 3: VSL a) Describe VSL (i.e., “Value of a Statistical Life”) in terms that a non-economist can understand, taking care to “de-stigmatize” this economic concept (i...
Jun 06 2020Which of these factors MOST shaped American identity? A: The United States is located in North America. B: Aristocratic royal governors oversaw the earliest British col...
Nov 26 2019Connie has a monthly income of $200that she allocates among two goods: meat and potatoes.a. Suppose meat costs $4 per pound and potatoes $2 per pound. Draw her budget con...
May 02 2020Describe the political risk, economic risk, and legal risk in doing business in a foreign country.
Jun 07 2020In a preliminary study, a simple random sample of 100 computer chips was tested and 17 of them were found to be defective. Another sample will be drawn in order to constr...
Apr 19 2020Suppose that a bank faces the following cash inflows and outflows during the coming week: (a) deposit withdrawals are expected to total $33 million, (b) customer loan rep...
Apr 24 2020Blooper Industries must replace its magnoosium purification system. Quick & Dirty Systems sells a relatively cheap purification system for $20 million. The system will la...
Apr 14 2020In Problem 6.31, find the rate of discharge if the frictional head loss in the pipe is 3.2 v2 /g where v is the flow velocity in the pipe.Problem 6.31Referring to the fig...
Mar 28 2020At the instant r = 1.5 m, the 5-kg disk is given a speed of v = 5m/s, perpendicular to the elastic cord.Determine the speedof the disk and the rate ofshortening of the el...
May 05 2020Welcome to MyCourseHelp Services, World's leading Academic solutions provider with Millions of Happy Students.